Data center migration services, priced line by line

Movers quote the same job in different ways, so their prices rarely line up. Describe your move once. You get the line items every quote should carry and the checks to make before you sign, and we bring you movers who price against that sheet.

Covers data center to colocation, colo to colo, in-building moves, server rooms and decommissioning, anywhere in the US.

Run by Metro Colo Advisory. Our team's comments on the data center market have run in Light Reading, Al Jazeera, Fortune and Inc.

Move manifest

No. DCM 4471

JobColo to coloTwo facilities, same metro
Pieces40 racksplus 26 loose devices
FromLoading dockSuite 210, by freight elevator
ToLoading dockCage 4B, ground floor
DistanceLocal, under 50 mi
WindowWeekendTwo weekends, 20 racks each
Declared value$1M to $5MFull value cover required
Quote lines17 lineson one price sheet
This way upFragileKeep dryAnti-staticSealed load

$0

in cargo insurance that federal rules require of a for-hire general freight carrier

FMCSA, Insurance Filing Requirements, 2026

700 lb

of installed gear a 42U shock pallet rack is rated to ship, against 1,826 lb standing still

Schneider Electric, FAQ FA294888 (AR4018SP)

1 in 5

operators said their latest major outage cost more than $1 million

Uptime Institute, Annual Outage Analysis 2026

$101.5M

in penalties for one bank after a mover resold drives that still held customer data

SEC 2022, OCC 2020, six states 2023

Build the quote before you ask for one

Six questions, about two minutes. You get the line items every mover should price for your job, what will push the price up, and the checks to make before you sign. Nothing is sent until you choose to send it.

Question 1 of 6

What are you moving?

Move manifest

No. DCM 4471

JobNot answered yet
PiecesNot answered yet
FromNot answered yet
ToNot answered yet
DistanceNot answered yet
WindowNot answered yet
Declared valueNot answered yet
Quote linesNot answered yet
This way upFragileKeep dryAnti-staticSealed load

What data center migration services cover

A physical data center migration is several jobs that happen to share a weekend. Each one usually belongs to a different firm, and most of the trouble on move night comes from the gaps between them. Before you ask anyone for a price, decide who owns each part.

Part of the jobWho usually does itWhat happens when nobody owns it
Inventory and move groupsYour IT team, sometimes with a planning consultantSystems that depend on each other end up on different trucks
Destination ready: power, circuits, cross-connectsYou and the destination facilityGear arrives at racks with no live circuit to plug into
De-install, labeling and packingA specialist IT moverCables go back into the wrong ports
Transport and cargo coverThe mover, or a freight carrier it booksDamage on a load worth millions, with cover set by weight
Re-rack and cablingThe mover or a cabling contractorA room cabled to the old layout instead of the new one
Power-on and testingYour team, with the mover's crew standing byFailures found after the crew has gone home
Retired gear and data destructionAn IT asset disposition firmDrives leave with no record of what happened to them
Handing back the old spaceYou, a removal crew and the landlordRent, holdover or removal charges after you thought you'd left

The mover's quote covers the middle rows. Everything above and below them is work your team, a planner or another vendor has to own, and a move goes wrong when nobody does.

Move it on a truck, or copy it and switch over

Every system in the room leaves one of two ways. Physical migration puts the hardware on a truck: it is powered down, packed, driven, racked again and started at the destination. Copying moves the data and the workload onto equipment or capacity that is already running at the other end, and the old hardware is retired or sold.

Trucking is cheaper when the gear is paid for, under support and has years left in it, and when the systems on it can be off for a night or a weekend. Copying costs more up front because two environments run at once, but the outage shrinks to minutes. Most migrations use both: the bulk of the room goes by truck, and the few systems that cannot stop are copied first.

The quote builder prices the trucked part. If some of your systems cannot be off for the length of the drive, list them in your request, and the reply covers how they move.

What drives the cost of a data center migration

There is no current public price list for moving a data center. The figure most often repeated, an Info-Tech Research Group survey average of $120,000 per relocation, or about $10,000 per rack, sits on a page first published in 2010. It is a reminder of scale, not a quote.

Info-Tech Research Group, Data Center Relocation Budget Tool (page published 2010, updated 2019)

What you can control is whether every mover prices the same job. Quotes for this work come in different shapes: one mover prices per rack, another per truck, a third per crew hour, and each leaves out different lines. Put them on one sheet and the gaps show up.

Cost lineHow movers usually price itWhat sets the amount
LaborCrew hours or a price per rack, per device or per desk, with a separate rate for nights and weekendsRacks and loose devices, access at each end, the work window
PackingPer piece, or as materialsHow much leaves the racks, and whether racks ship loaded on shock pallets
TransportPer truck, per day, or per mile on long haulsDistance, a dedicated truck, air-ride, two drivers
Cargo coverA declared value or a policy for the loadThe value of what is on each truck
Destination workPer rack for re-racking and cabling, per hour for power-on supportWhether you reuse cables, and how long the crew stays
Retired gearPer piece or per drive, less any resale creditHow many drives, the destruction method, the age of the gear

Lines that tend to go missing

  • Night and weekend rates. If the window is a weekend, the quote should say which hours bill at which rate and what happens when the window runs long.
  • Cover at the value of the load. A carrier's liability is often capped at a declared value or by weight. Ask for the limit per load in writing.
  • Vendor support after the move. Some hardware support only resumes after the maker inspects gear moved by someone else, and that inspection is billed.
  • Facility charges. After-hours dock time, freight elevator time and debris removed from a cage can be billed by the building, not the mover.
  • Storage. Facilities hold deliveries for days, not weeks, so a gap between legs means a warehouse.

How a request turns into comparable quotes

  1. You describe the move

    Through the quote builder or the request form: the equipment, both addresses and the window you have.

  2. We confirm the scope

    Expect an email from us within one business day listing anything we still need to know, the movers we would put your job to, and how the work would be paid for.

  3. Movers price one sheet

    Two or three movers that fit the job price the same line items, with your quantities, so the totals mean the same thing.

  4. You choose

    We go through the quotes with you line by line. You sign with the mover directly, and we stay on the thread to move day.

The bar a mover clears before it sees your job

Your equipment list and addresses go to a mover only after it has shown us the following, and you have approved it. The same checks are on the movers page if you would rather run them yourself.

Operating authority checked

USDOT number, and MC number for interstate hauls, matched to the legal name on FMCSA's public records

Cargo limit in writing

The cover per load stated on the quote, at or above the value you give us, not “fully insured”

Certificates both buildings accept

Insurance certificates worded to each facility's vendor rules before move day

A real custody record

A redacted record from a past job, with seal numbers, handoff signatures and an arrival count

Destruction you can audit

For anything retiring: the sanitization standard, R2 or e-Stewards recycling, and a certificate listing serial numbers

A named lead

The person at your dock on the night, introduced to you before move day

The moves this site scopes

Data center relocation

Whole rooms and cages moving between buildings, with the line items and the costs that come with them.

Choosing a data center mover

The kinds of firms that move IT equipment, what each fits, and how to check what they claim.

Server relocation

One rack to twenty: packing, loaded racks, transport and the support contracts that ride along.

IT relocation

Office moves, comms rooms and server closets, and who to hire for each.

Decommissioning

Removal, data destruction, resale credit and handing the old space back.

About the relocation desk

A relocation desk that scopes jobs and finds movers. It does not own trucks.

Questions about data center migration services

How much do data center migration services cost?

There is no current public price list. The most quoted benchmark, an Info-Tech survey average of $120,000 per relocation or about $10,000 per rack, comes from a page first published in 2010. Price depends on the number of racks and loose devices, access at each building, the work window, the distance and the value of the load. The quote builder lists the lines a quote should price, so you can compare movers on the same terms.

Do you move the equipment yourselves?

No. We are the desk that scopes the job, finds the movers that fit it and keeps every quote on the same sheet. The physical work is done by specialist IT movers, cabling crews and disposition firms, and you contract with the one you choose. We stay on the thread until the job is done.

How are you paid?

When your equipment is moving into a colocation facility we place you in, the facility pays us, and scoping and running the move costs you nothing extra. For every other move, we scope and oversee it for a fixed fee you approve in writing before we start, and any payment from a mover or facility is disclosed the same way.

Can a data center be moved without downtime?

Not by truck. Anything on the truck is off for the drive, the unload and the startup. Systems that cannot take that outage have to be copied to the destination ahead of time and switched over, which means equipment or capacity waiting at the other end. Most moves mix the two, and the quote builder treats the trucked part.

What is the difference between data center migration and data center relocation?

People use the words loosely. Relocation usually means the physical move of equipment from one site to another. Migration is wider: it covers moving workloads by any method, including copying data to new hardware or to cloud, with no truck involved. This site deals with the physical side and the people you hire for it.

How quickly can a move happen?

Small jobs in the same metro can be scheduled within a few weeks if both buildings can take the crew. Larger moves wait on things outside the mover's control: new circuits at the destination, dock bookings, and the notice your current facility requires. The reply to your request names the date that will set the pace.

What areas do you cover?

Moves anywhere in the United States, including cross-country hauls. Moves that cross a border need a customs broker as well as a mover, and we say so up front if your job is one of them.