IT relocation services for offices, comms rooms and data centers
IT relocation covers three different jobs that get sold under one name. An office of desks, a closet of network gear and a row of racks need different crews, different windows and different quotes.
Checked November 2026
Three kinds of IT relocation, and who to hire for each
Most confusion about IT relocation services comes from treating these as one job. Decide which you have before asking anyone for a price, because the firm that is right for one is often wrong for another.
| Kind of IT move | What moves | Who to hire | How it is usually priced |
|---|---|---|---|
| Office desks | PCs, monitors, docks, phones, printers | An office mover for the furniture, and your IT team or a managed service provider for disconnect and setup | Per desk, plus a day-one check |
| Comms room or server closet | One to a few racks, a switch stack, a firewall, a phone system | A specialist IT mover, with your network team or provider on site | Per rack or per device, plus after-hours labor |
| Data center or colo footprint | Full racks, storage arrays, network cores | A specialist IT mover working to a written runbook | Per rack and per truck, plus cover at the value of the load |
Many office moves include all three: desks, a comms closet and a few racks that go to a colocation facility instead of the new office. Price each part with the firm that fits it, on one sheet, so the handoffs are written down.
Before move day
- Survey the new space early. Count network jacks and outlets against the seating plan. A shortage found on move day means desks that can't connect.
- Order internet and phone service at the new address as soon as the lease is signed, and plan the cutover date with the carrier.
- Back up and record. Backups checked by a test restore, the network configuration saved, and a list of every device with its service tag.
- Label everything to the person. Each desk's computer, monitors and dock tagged so they reach the same person at the new desk.
- Decide what retires. Old PCs and the closet switch you meant to replace are cheaper to send to a disposition firm than to move.
Move day and the day after
- Disconnect the day before. Peripherals and cables bagged and labeled, desktops boxed, power strips and cords in one box per desk.
- Network first. The comms room or closet goes in and is tested before desks are reconnected.
- Desks in place before IT reconnects. Furniture in its final position, so cables reach the jacks.
- Test at every desk. Log in, network, printing and phone, checked with the person who uses it.
Steps drawn from university IT move guides: UNLV Office of Information Technology, Montana State University UIT, University of Toledo IT and Purdue IT.
IT equipment relocation: servers and network gear
The network gear and any servers are the part of an office move that can stop the business. Treat them as a small data center move: anti-static packing, a custody record if drives hold customer data, and time for equipment to acclimate before it powers on if it rode in a cold truck. Hardware makers set that wait at anywhere from a few hours to more than a day, depending on how cold it got.
If anything is under a hardware support contract, ask the vendor before you book a mover whether a third-party move affects coverage. The server relocation page covers packing, loaded racks and support contracts in detail.
What drives the cost of an IT relocation
- Desk count, priced per desk, with a day-one check at each one adding to it.
- Racks and network gear, priced per rack or per device, plus the hours the network team is on site.
- The window. Night and weekend crews cost more, and most office IT moves happen then.
- Access. No dock, a small elevator or stairs adds people and time.
- Cabling at the new site, if the space needs new runs or a new closet built out, which is often a separate contractor.
Buyer questions
How much do IT relocation services cost?
There is no reliable public price list for US IT moves. Office moves are usually priced per desk, comms rooms per rack or device with after-hours labor on top, and data center moves per rack and per truck with cover at the value of the load. The quote builder lists the lines for your move so quotes can be compared.
How far ahead should we plan IT for an office move?
Start as soon as the new space is chosen. The new building needs a survey to find missing network jacks and outlets, internet service at the new address can take weeks to months to install, and even in-house IT teams ask for notice: UNLV's IT office, for example, wants two weeks to schedule staff for computer moves.
Do we need an IT mover, or can the office movers handle the computers?
Office movers can carry the boxes. Someone still has to disconnect, label and set up each desk, move the network and phone gear, and test it all on day one. If your IT team or provider does that, an office mover may be enough. A comms room or server rack is a job for a specialist IT mover.
What happens to our phones when we move?
Desk phones need their emergency location updated at the new address so 911 calls report the right place, which is why some IT teams take phone moves as a separate request. Tell your phone provider the move date early.
Can the move happen over a weekend?
Yes, and most office IT moves do, so desks work on Monday. Expect night and weekend labor to be priced higher, and check when each building lets crews use the dock and elevators.